Engineers available to service machinery overseas, Engineers available to service machinery overseas
Capacity:
50-300 tph
Recovery Rate:
98%
Gold Refinery System:
Shaker table+amalgamator+furnace
Powering System:
Diesel generator
Clay Processing System:
Heavy duty clay scrubber
Screening System:
Diesel generator
Fine Gold Recovery System:
Knelson concentrator
Coarse Gold Recovery System:
Hydraulic vibrating sluice+sluice box
Supply Ability
Supply Ability:
4 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Packaging of Professional Gold Panning Equipment for sale
1,LCL : Wood case or channel steel frame with iron piece
2,FCL : Nude and firmed in container (20GP, 40GP, 40HQ)
Port
Qingdao
Lead Time
:
Quantity(Pieces)
1 - 2
>2
Est. Time(day)
40
To be negotiated
Video Description
Description
Features of SINOLINKING gold vibrating table separating machines gold mining machine
1) The SLK-MZD series gold washing plant are designed according to your specific mining conditions and requirements. 2) Feeding system with grizzly hopper feeder, water spray pipes inside the hopper for spray waters to the soils. 3) Heavy duty clay scrubber with inside high pressure water spray pipes for breaking off hard clay. (if required) 4) Double polyurethane decks screen with high pressure water spray pipes for washing, screening and separating. 5) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%). 6) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc. 7) Powering system with Cummins diesel generator with all batteries, cables and wires. 8) Multiple sets of heavy duty mining type tires with towing mechanism for fully mobility and portability. 9) Gold refinery plant to make final product of gold bars. 10) Easy for installation, operation and maintaining. 11) One-Stop gold mining solutions from A to Z.
Grizzly screen space: 150mm or as required Grizzly material: Railway tracks Remark: Water spray pipes along hopper sides Function: To feed the materials evenly to the scrubber and trommel
Clay Processing System
Name: Clay Scrubber Size (mm): φ1200*3000 or according to processing capacity Remark: With inside water spray pipes Function: To break off hard clays to increase gold recovery
Screening System
Name: Vibrating deck screen Size (mm): φ1500*4800 or according to processing capacity Remark: 2 layer decks Material: Polyurethane deck Function: for washing, screening and separating the minerals Water spray pipes: above the top deck Mesh size: `12mm and 6mm or according to clients requirement
Size: 1m*6m Sluice box carpet: Mitsubishi brand, imported from Japan Function: For coarse gold recovery Recovery rate: 99%
Fine Size Gold Recovery System
Name: Knelson type centrifugal concentrator Processing capacity: 15tph-60tph dry solids Quantity: 2-4 pcs Remark: Fully continuous type Function: For fine size dust gold recovery (-6mm) Recovery Rate: 99%
Water Supplying System
Name: Submersible slurry pump Quantity: 1-3 pcs Water flow: 120-400m³ per hour Funciton: For supplying water to the wash plant
Powering system
Name: Cummins diesel Generator Power: 100Kw-350Kw Brand: Cummins, Weichai, or as required Function: supplying power to all the systems
Gold Shaker Table
Model: 6S Power: 2.2Kw Function: to further process the concentrates from the sluice and/or concentrators
Mercury Amalgamator
Type: V-shaped Working mode: amlagamator + distiller retort Function: With the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentators Recovery rate: 100%
Gold Smelting Furnace
Capacity: 10-15kg per batch Moulds: 100g; 200g; 500g; 1000g Function: to smelting the gold sand and make into final product of gold bars
Gold mixture
Pure gold sand
Gold bars after smelting
Our Service
Pre-Sales Service
* Receiving clients inquiry * Studying clients mining conditions * Introducing our machinery * Propose the most suitable solution
After-Sales Service
* Design outlet with 3D drawing photo * Producing according to the design
* Inspection and testing before delivery * Engineers installation and training service overseas
1. How long takes for installation ? -Normally within 7-10 days if everything is ready. 2. What are the oversea service charge ? -Airline tickets, visa fees and salary
Our Factory
Why Chose Us?
1. 15 Years factory 2. Exported to 35 countries
3. Over 300 projects worldwide 4. All customized design 5. Ensure highest recovery rate of gold 6. Short delivery time 7. Easy to install, operate and maintain 8. Super durable heavy duty machine 9. One-stop mining solution 10. Turn-key operations
FAQ
1. Are you factory? Yes, established in 2002, over 15 years factory 2. How big are you? In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers 3. What equipment do you build? Specialized in alluvial/placer gold/diamond mining equipment 4. Whats the capacity of the gold/diamond mining equipment From 5TPH to 450TPH 5. What brand engine/diesel generator do you use? Cummins, Weichai, Yuchai, etc, or as required
Contact Us
Alisa Wang
One-Stop Gold Mining Solutions>>> with Turn-Key Operations>>> Wechat: 18353622797 Mb/WhatsApp: +86 18353622797 Skype: 1348161328 at qq.com